Oversized Glass for a Showroom
Wagner Design Lab, Langenneufnach, Germany
Nearly 20 m long glass units open up the two long sides of the Wagner Design Lab almost completely. sedak produced four triple insulating glass units for the project, each measuring 3.04 × 19.21 m. Two units form a facade area of approximately 117 sqm with only one vertical joint. The glass build-up combines a 2-ply TVG laminate, a low-e coating, and an SG interlayer.
Two triple insulating glass units measuring 3.04 × 19.21 m form a facade area of approximately 117 m². The oversized format reduces each of the two long sides to a single vertical glass joint. © wagner living
Four oversized IGUs. Two nearly seamless facade surfaces.
sedak produced four triple insulating glass units, each measuring 3.04 × 19.21 m. Two units form a glass facade of approximately 117 m². As a result, each of the Design Lab’s two long sides is divided by only a single vertical glass joint. The oversized format supports the architectural concept of a transparent building volume that appears almost completely open.
Precision across 19.21 m of glass.
At this glass length, cutting, edge processing, tempering, lamination, and insulating glass production must be coordinated across the entire unit. Dimensional accuracy, flatness, edge seal, and handling become key requirements as the format increases. Internal transportation, packaging, and construction-site logistics therefore also have to be taken into account during production planning.
Triple insulating glass with a complex glass build-up.
The four units are designed as triple insulating glass units. The project-specific glass build-up includes a 2-ply TVG laminate with an SG interlayer and a low-e coating. The project therefore combines oversized lamination with the functional requirements of an insulating glass facade—without additional vertical divisions in the nearly 20 m long glass surfaces.
20 m of glass through sedak production
The dimensions begin with the individual glass pane. During tempering, sedak convection technology enables controlled thermal treatment even for oversized formats. The sedak tempering furnaces are designed for glass up to 3.6 × 20 m. The project film then documents the entire journey of the Wagner glass—from production and handling to transportation and installation in Langenneufnach
infos + facts
| Client | Architeture | WAGNER / Topstar GmbH | Titus Bernhard Architekten |
|---|---|
| Execution | Friedrich Burk GmbH + Co. KG |
| Glass | Facade glass, sedak clear-edge | flat |
| Scope | 4 TGU | 3.04 x 19.21 m |
FAQ Oversized Glass for Showrooms – Wagner Design Lab
Oversized Glass
What oversized glass did sedak produce for the Wagner Design Lab?
sedak produced four triple insulating glass units, each measuring 3.04 × 19.21 m. Two units form a facade area of approximately 117 qm with only one vertical joint.
Oversized Glass
What makes nearly 20 m long oversized insulating glass technically demanding?
At a length of 19.21 m, cutting, edge processing, tempering, lamination, and insulating glass production must be precisely coordinated across the entire glass unit. The oversized format and weight also place particular demands on quality assurance, internal handling, packaging, transportation, and installation.
Oversized IGU
What glass build-up did sedak use for the oversized IGU?
The units are designed as triple insulating glass units. The project-specific glass build-up includes a 2-ply TVG laminate with an SG interlayer and a low-e coating.
Glass architecture
Why does oversized glass reduce visible facade joints?
Each glass unit is 19.21 m long. As a result, two insulating glass units span an entire long side of the Design Lab and form approximately 117qm of facade with only one vertical joint. Smaller glass formats would have required additional divisions.
oversized showroom glazing
sedak develops and produces oversized insulating glass units with project-specific laminates, edges, and special cut-outs. We review glass format, laminate build-up, edge seal, processing, handling, and the production process at an early stage of the project.